作 者:王钊 高明坤 WANG Zhao;GAO Mingkun(Shandong Chengxin Engineering Construction Supervision Co.,Ltd.,Jinan 250101,China)
机构地区:[1]山东诚信工程建设监理有限公司,山东济南250101
出 处:《电工技术》2022年第14期172-174,共3页Electric Engineering
摘 要:平山电厂二期工程为“国家示范工程”,是目前全球单机运行功率最大的燃煤发电机组。以世界首台1350 MW机组汽轮发电机基座隔振弹簧安装为例,总结了超大容量机组汽轮发电机基座施工过程中弹簧隔振器安装监理要点及注意事项,可供国内同类工程参考借鉴。The second phase project of Pingshan power plant is a"national demonstration project",and it is the largest coal-fired unit in the world.Taking the installation of vibration isolation spring on steam turbine base of the world's first 1350 MW unit as an example,the main points and precautions of spring vibration isolator installation supervision during the construction of the turbo-generator base of the super-capacity unit are summarized,which can be used as a reference for similar projects in China.
分 类 号:TM621[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.142.53.239