检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:房涛 陆斌 丁婷 李守仁 刘成 Fang Tao;Lu Bin;Ding Ting;Li Shou ren;Liu Cheng(Oil Production Plant of East China Branch Company,SINOPEC,Taizhou Jiangsu 225300)
机构地区:[1]中石化华东油气分公司泰州采油厂,江苏泰州225300
出 处:《石化技术》2022年第7期108-110,共3页Petrochemical Industry Technology
摘 要:对电流法、峰值功率法、均值功率法进行了总结,得出平衡块调整量的计算公式。均值法节电效果最明显,确定了均值功率平衡度的标准区间为75~120%。通过调整,ZC区块单井日节约耗电达17%,应用效果显著,年节约电费10余万元。Summarize current balance method,peak power methods,and mean power methods. to obtain the calculation formula of the adjustment amount of the balance block. Among them,the mean power method is most obvious,and the standard interval of the mean power balance is determined to be 75~120%. Through the adjustment of balance,the single-mean power method of the single well is 17% in ZC oilfield,the application effect is remarkable,and the annual annual electricity bill is more than 10,000 yuan.
分 类 号:TE933.1[石油与天然气工程—石油机械设备]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3