检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:康士明 KANG Shi-ming
出 处:《节能与环保》2022年第7期65-66,共2页
摘 要:当前,住房和城乡建设部及各省政府均在大力推进绿色施工,节水与水资源利用是绿色施工的重要内容之一。根据房地产开发项目建设的一般规律,主体结构施工阶段的时间远大于基坑阶段施工时间。基坑阶段降水利用研究较为成熟,但主体阶段施工用水回收利用涉及较少。本文在通过分析主体阶段施工用水,通过前期预设水回收管井,将日常施工用水予以回收再利用;以较少投入,获得绿色环保收益,守护绿水青山。At present,the Ministry of housing and urban rural development and provincial governments are vigorously promoting green construction.Water saving and water resource utilization are one of the important contents of green construction.According to the general law of real estate development project construction,the construction time of main structure is much longer than that of foundation pit.The research on the utilization of dewatering in the foundation pit stage is relatively mature,but the recycling of construction water in the main stage is less involved.In this paper,by analyzing the construction water in the main stage,the daily construction water is recycled through the preset water recovery tube well in the early stage;With le ss investment,we can obtain the benefits of green environmental protection and protect the green water and green mountains.
分 类 号:X799.1[环境科学与工程—环境工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49