作 者:周晓军[1] 宁远思 杨昌宇[3] ZHOU Xiaojun;NING Yuansi;YANG Changyu(School of Civil Engineering,Southwest Jiaotong University,Chengdu 610031;East Ring Line Construction Headquarters of Chongqing Railway Hub of China Railway Chengdu Bureau Group Co.Ltd.,Chongqing 400023;China Railway Eryuan Engineering Group Co.,Ltd.,Chengdu 610031)
机构地区:[1]西南交通大学土木工程学院,成都610031 [2]中国铁路成都局集团有限公司重庆铁路枢纽东环线建设指挥部,重庆400023 [3]中铁二院工程集团有限责任公司,成都610031
出 处:《现代隧道技术》2022年第4期204-217,共14页Modern Tunnelling Technology
基 金:成都铁路局科技研究开发计划项目(CX1873)。
摘 要:矿山法隧道采用模筑现浇混凝土衬砌时无法完全消除隧道拱部存在的混凝土衬砌厚度不够、强度不足、开裂掉块和背后脱空等常见质量缺陷,对铁路隧道的长期安全运营构成威胁。以重庆铁路枢纽东环线胡家沟隧道为依托工程,提出了复合式衬砌中拱部采用预制块和边墙模筑衬砌相组合的拼装二次衬砌,分析了拱部预制衬砌的分块方式和接头构造,总结了该预制拼装衬砌结构的施工工艺和经济性,并根据现场监测结果分析了衬砌结构的安全性和耐久性。结果表明:胡家沟隧道拱部预制衬砌试验段所设计的初期支护和装配式二次衬砌结构参数是可行的,且衬砌具有一定的安全储备;拱部预制衬砌和模筑边墙的接头形式宜设计为圆弧形;拱部预制拼装二次衬砌方案的总造价比模筑二次衬砌的总造价增加了314.71万元,综合造价增加了2.86万元/m。Tunnel construction through the mining method with cast-in-place concrete lining often fails to completely eliminate common quality defects, such as insufficient thickness of concrete lining, insufficient strength, cracking and spalling, and void behind in tunnel arch, which poses threats to the long-term safe operation of railway tunnels.This paper relies on the Hujiagou Tunnel Project of the East Ring Line of Chongqing Railway Hub and proposes to use assembled secondary lining for the arch of the composite lining by combining prefabricated blocks and sidewall molded lining. This paper analyzes the blocking method and joint structure of the prefabricated lining in the arch,summarizes the construction process and economy of the prefabricated lining structure, and analyzes the safety and durability of the lining structure according to field monitoring results. The results show that the structural parameters of the initial support and assembled secondary lining designed for the prefabricated lining test section of the arch of the Hujiagou Tunnel are feasible, and the lining allows for sufficient safety;The form of joints for the prefabricated lining of the arch and the cast-in-place sidewall should be designed in the form of a circular arc;The total cost of the scheme of secondary lining with prefabricated arch increases by RMB 3,147,100 compared with the total cost of the cast-in-place secondary lining, and the comprehensive cost increases by RMB 28,600/m.
关 键 词:矿山法 双线铁路隧道 拱部预制块 结构设计 预制拼装二次衬砌
分 类 号:U455.41[建筑科学—桥梁与隧道工程]