检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘东海[1] 戴怀建 郑涵 LIU Donghai;DAI Huaijian;ZHENG Han(State Key Laboratory of Hydraulic Engineering Simulation and Safety,Tianjin University,Tianjin 300350,China)
机构地区:[1]天津大学水利工程仿真与安全国家重点实验室,天津300350
出 处:《水利学报》2022年第8期914-925,共12页Journal of Hydraulic Engineering
基 金:国家自然科学基金面上项目(51979189)。
摘 要:寒区砾质土心墙堆石坝冬季施工面临着心墙土料冻结与融化问题。通常冬季心墙填筑采用摊铺保温材料以防止土料冻结,但易干扰施工,导致有效填筑时间缩短。本文利用相变材料(Phase Change Material, PCM)的相变储放热性能,制备了心墙相变砾质土,用于寒区冬季砾质土心墙控温防冻。通过渗透试验、无侧限抗压试验、三轴试验、热常数试验及温控试验等,研究不同PCM掺量下心墙相变砾质土工程特性和防冻控温性能。试验结果发现,相变砾质土的无侧限抗压强度、抗剪强度和抗渗性能均随PCM掺量的增加而显著提高;随着PCM掺量的增加,相变砾质土导热系数及比热下降。在室内控温箱试验验证相变传热模型有效性的基础上,开展了心墙相变砾质土施工控温有限元模拟,分析了不同施工环境温度(最低温-5℃、-8℃和-10℃)工况下心墙相变砾质土的温控效果,发现6%PCM掺量的相变砾质土在最低温-5℃施工环境下保证土体不发生冻结;采用提高制备温度和上层铺筑联合控温措施,可保证最低温-10℃施工环境下心墙连续高效填筑;与常规砾质土相比,相变砾质土可延长心墙冬季施工时间,改善了心墙砾质土防冻性能,为心墙土料冬季施工防冻提供了一种潜在选择。Core-wall construction of a gravelly soil rockfill dam in cold region usually faces the freeze-thaw challenge.In current practice, it is common to cover soil with thermal insulation material to prevent core wall from freezing.However, the release and reclaim process of thermal insulation material easily interfere the core-wall compaction process, which would reduce the effective construction time.Based on the heat storage/release property of phase change material(PCM),this paper developed a phase change material incorporated into gravelly soil(PCM-GS) to improve the anti-freezing performance in a cold period.The engineering characteristics and anti-freezing performance of PCM-GS was analyzed through permeability, unconfined compression, triaxial compression, hot disk and temperature control tests.The results indicate that the unconfined compressive strength, shear strength and impermeability of PCM-GS are significantly higher than those of the gravelly soil without PCM.The thermal conductivity and specific heat of PCM-GS decrease with PCM content.According to the temperature control test, a finite element simulation model of heat transfer with PCM-GS was verified under core-wall construction conditions.The anti-freezing performance of PCM-GS during winter construction was analyzed under different ambient air temperatures(minimum temperatures are-5 ℃,-8 ℃ and-10 ℃,respectively).The simulation result shows that the PCM-GS at 6% PCM content is able to prevent soil from freezing when the minimum ambient temperature is-5 ℃.The combination of increasing the initial temperature of PCM-GS and covering an upper layer assures the continuous core-wall construction with high efficiency when minimum ambient temperature is-10 ℃.Compared with gravelly soil without PCM,the PCM-GS extend the construction time for core-wall compaction in winter, which offers a potential alternative to improve the anti-freezing performance of PCM-GS during winter construction.
关 键 词:心墙堆石坝 寒区施工 相变砾质土 工程特性 防冻控温
分 类 号:TV641.41[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.200