作 者:康龙 KANG Long(State Grid Jinhua Power Supply Company,Jinhua 321017,China)
机构地区:[1]国网浙江省电力有限公司金华供电公司,浙江金华321017
出 处:《湖南电力》2022年第4期46-49,74,共5页Hunan Electric Power
摘 要:针对设备N-1故障后断面功率越限、电网供电能力下降等问题,分析目前断面越限控制时间的特点及原因,提出预案可视化的方法。将500 kV主变压器故障下的事故预案在系统中图形化以及批量控制一键化操作,实现500 kV故障情况下快速转移或者切除负荷,为500 kV主变压器发生故障时实现快速控制断面越限提供参考.In order to solve the problems of cross-section power exceeding limit and power supply capacity decreasing after N-1 fault,the characteristics and reasons of cross-section exceeding control time are analyzed,and the visualization method of preplan is put forward.By making the accident preplan of 500 kV main transformer failure in the graphical and batch control one cliok operation of the system,fast load transfer or cutoff under 500 kV failure is realized,it provides a reference for realizing fast control cross-section limit crossing when 500 kV main transformer fails.
分 类 号:TM712[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49