500kV主变压器N-1故障后断面功率越限控制时间研究  被引量:1

Research on Cross-Section Overload Control Time of 500kV Main Transformer after N-1 Fault

在线阅读下载全文

作  者:康龙 KANG Long(State Grid Jinhua Power Supply Company,Jinhua 321017,China)

机构地区:[1]国网浙江省电力有限公司金华供电公司,浙江金华321017

出  处:《湖南电力》2022年第4期46-49,74,共5页Hunan Electric Power

摘  要:针对设备N-1故障后断面功率越限、电网供电能力下降等问题,分析目前断面越限控制时间的特点及原因,提出预案可视化的方法。将500 kV主变压器故障下的事故预案在系统中图形化以及批量控制一键化操作,实现500 kV故障情况下快速转移或者切除负荷,为500 kV主变压器发生故障时实现快速控制断面越限提供参考.In order to solve the problems of cross-section power exceeding limit and power supply capacity decreasing after N-1 fault,the characteristics and reasons of cross-section exceeding control time are analyzed,and the visualization method of preplan is put forward.By making the accident preplan of 500 kV main transformer failure in the graphical and batch control one cliok operation of the system,fast load transfer or cutoff under 500 kV failure is realized,it provides a reference for realizing fast control cross-section limit crossing when 500 kV main transformer fails.

关 键 词:N-1 断面功率越限 预案可视化 一键化操作 

分 类 号:TM712[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象