检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:肖智刚 常荆华 王刚 谢凌博 冯宇豪 XIAO Zhigang;CHANG Jinghua;WANG Gang;XIE Lingbo;FENG Yuhao(State Grid Xianyang Power Supply Company,Xianyang,Shaanxi 712000,China)
出 处:《东北电力技术》2022年第8期42-44,共3页Northeast Electric Power Technology
摘 要:为防止零序回路验收存在问题导致保护不能正确动作,根据10 kV系统中性点接地方式的不同,讨论了中性点不接地及中性点经小电阻接地时,零序TA回路验收常见的问题,并针对电缆金属护层接地线、零序TA极性以及开关柜接入多回电缆等常见问题进行分析,阐述了其对保护动作正确性的影响。In order to prevent the false action of the protection caused by problems in the acceptance of the zero-sequence circuit,according to the different neutral point grounding modes of 10 kV system,it mainly discussed some common problems of neutral point ungrounded system and low resistance grounding system.It analyzes ground wire of cable metal sheath,the polarity of zero-sequence TA and cables access to one switch cabinet.It explained how these problems affect protection action.
分 类 号:TM862[电气工程—高电压与绝缘技术]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7