再谈满井放矿  被引量:1

Rediscussion on the Pass Drawing of Mine Shaft Filled with Ore

在线阅读下载全文

作  者:詹森昌 ZHAN Senchang

机构地区:[1]江西铜业集团有限公司德兴铜矿,江西德兴334224

出  处:《中国矿山工程》2022年第4期21-24,共4页China Mine Engineering

摘  要:溜井放矿有很多优点,但也存在一些大的隐患,影响它的应用。井筒装满矿降低井壁剪应力,消除冲撞和滚撞对井壁的磨损破坏。井筒装满矿产生的摩擦磨损,消除卸矿的矿石对井筒中矿石的冲撞,井筒中矿石的黏结力基本保持稳定,减少井筒结拱堵塞的概率。满井放矿是消除隐患的重要措施。There are many advantages in pass drawing,but there are also some hidden dangers which affect its application.When the shaft is filled with ore,the shear stress of the shaft wall can be reduced,and the wear damage caused by collision and rolling on the shaft wall can be eliminated.The friction and wear caused by the shaft filling with ore can eliminate the impact of the unloading ore on the ore in shaft,and the cohesion of the ore in shaft is basically stable,reducing the probability of blockage due to arch forming in the shaft.Pass drawing when the mine shaft is full is an important measure to eliminate hidden danger.

关 键 词:满井放矿 井壁应力 磨损破坏 堵塞跑矿 风险可控 

分 类 号:TD853[矿业工程—金属矿开采]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象