检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:邱超 QIU Chao
机构地区:[1]上海城投水务工程项目管理有限公司,上海市201103
出 处:《城市道桥与防洪》2022年第8期99-101,M0013,共4页Urban Roads Bridges & Flood Control
摘 要:初雨调蓄池的设置已逐渐成为解决初期雨水污染的最经济高效手段之一。结合天山污水处理厂初雨调蓄池的实际工程案例,详细阐述初雨调蓄池在城市排水系统中的功能和设计要点,旨在为后期初雨调蓄池的优化设计提供重要的理论支撑和经验借鉴。The setting of initial rainwater storage tank has gradually become one of the most economical and efficient means to solve the initial rainwater pollution. Combined with the actual engineering case of the initial rainwater storage tank of Tianshan Wastewater Treatment Plant, the functions and the design essentials of the initial rainwater storage tank in the urban drainage system are set forth in detail. The aim is to provide the important theoretical support and experience reference for the optimal design of the initial rainwater storage tank in the later stage.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7