作 者:张琪峰 袁超 黄杰 ZHANG Qifeng;YUAN Chao;HUANG Jie
机构地区:[1]悉地(苏州)勘察设计顾问有限公司,江苏苏州215123
出 处:《城市道桥与防洪》2022年第8期156-159,M0017,M0018,共6页Urban Roads Bridges & Flood Control
摘 要:针对传统基于任务的施工进度管理方法的不足,结合BIM可视化、构件化的特点,提出了基于EBS构件编码的工程项目施工进度管理方法。其核心思想是将单个构件作为进度管理的基本对象,对其进行进度相关的定义和填报,使管理颗粒度达到构件级,并对模型创建、构件编码、施工组织计划编制、平台化管理等关键技术提供了解决方案。经项目验证,该方法能较好地满足现场精细化管理要求,可操作性强,实际应用效果佳。Aiming at the shortcomings of traditional task-based construction schedule management methods, combined with the characteristics of BIM visualization and componentization, an engineering project construction schedule management method based on EBS component coding is proposed. Its core idea is to take a single component as the basic object of schedule management, and to define and report the related schedule, which achieve the component level of management granularity. The solutions are proposed for the key technologies such as the model creation, component coding, construction organization planning, platform management, etc. After the project verification, the method can better meet the requirements of on-site fine management with the strong operability and good practical application effect.
关 键 词:进度管理 EBS构件编码 施工组织计划 平台管理
分 类 号:U495[交通运输工程—交通运输规划与管理]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15