钱塘江冲海粉砂层工法桩围护结构施工技术  

Construction Technology of Retaining Structure of Pile with Silt Layer Construction Method in Qiantang

在线阅读下载全文

作  者:谢皆睿 Xie Jierui

机构地区:[1]中铁十六局集团轨道公司,北京101100

出  处:《江苏建材》2022年第4期73-75,共3页Jiangsu Building Materials

摘  要:结合杭州地铁8号线河景路站附属围护结构施工,对SMW工法桩在钱塘江冲海粉砂层中的施工技术进行了探讨。通过对施工管控、施工质量缺陷分析,提出了提高桩体质量的建议及基坑渗漏水等的处理方案;对成桩质量进行了钻芯法检测,得出成桩质量满足设计强度与施工要求。Combined with the construction of the auxiliary envelope structure of Hejing Road Station of Hangzhou Metro Line 8,the construction technology of SMW construction piles in the silt layer of Qiantang River is discussed.Through the analysis of construction control and construction quality defects,suggestions for improving the quality of piles and treatment schemes for seepage and leakage of foundation pits are proposed.The pile quality was tested by drilling core method,and the pile quality met the design strength and construction requirements.

关 键 词:SMW工法桩 粉砂层 三轴搅拌桩 基坑围护 

分 类 号:TU74[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象