检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:朱洪利 Zhu Hongli(Shandong Energy Zaozhuang Mining Industry(Group)Co.,Ltd.,Shandong Zaozhuang 277000)
机构地区:[1]山东能源枣庄矿业(集团)有限责任公司,山东枣庄277000
出 处:《山东煤炭科技》2022年第8期177-179,共3页Shandong Coal Science and Technology
摘 要:为有效处理海子矿富水岩层在采用冻结法建井时出现的技术问题,对凿井过程中冻结内壁的冻胀力进行了现场实测。实测结果表明,冻结内壁的平均冻胀力与冻结深度之间几乎呈线性关系,同时发现冻结内壁冻胀力的发展变化过程大致分为快增过程、快降过程、缓增过程及稳定过程,不同过程呈现出不同的速率变化特性。In order to effectively deal with the technical problems occurred in the construction of wells by freezing method in the water rich rock of Haizi Mine,the frost heave force of the frozen inner wall in the process of shaft sinking was measured on site.The measured results show that the average frost heaving force of the frozen inner wall is almost linearly related to the freezing depth.At the same time,it is found that the development and change process of the frost heaving force of the frozen inner wall can be roughly divided into a rapid increase process,a rapid decrease process,a slow increase process and a stable process,and different processes show different rate change characteristics.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.147