检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张延森 ZHANG Yansen(Shandong Branch of China National Geological Exploration Center of Building Materials Industry)
出 处:《现代矿业》2022年第8期92-94,98,共4页Modern Mining
摘 要:合理的采矿方法是复杂工程地质条件下矿体安全开采的关键。针对某地下铁矿过渡段残留矿体上覆为崩落体,下方为充填体的复杂工程地质条件,结合矿山现有生产技术条件,初步选定上向水平分层充填法、上向进路充填法、分段空场嗣后充填法、无底柱分段崩落法4种备选采矿方法。运用灰色关联法综合考虑多项技术指标,计算4种备选采矿方法关联度,结果分别为0.508、0.437、0.524、0.644,从而确定无底柱分段崩落法为最佳备选方法。Reasonable mining methods are the key to safe mining of ore bodies under complex engineering geological conditions.In view of the complex engineering geological conditions of the residual ore body in the transition section of an underground iron mine,which is overlying the caving body and below the filling body,combined with the existing production technical conditions of the mine,four alternative mining methods are preliminarily selected,namely,upward horizontal layered filling method,upward route filling method,segmented open field subsequent filling method,and non-pillar segmented caving method.The grey correlation method was used to comprehensively consider a number of technical indicators,and the correlation degrees of four alternative mining methods were calculated.The results were 0.508,0.437,0.524 and 0.644,respectively.Thus,the non-pillar sublevel caving method was determined as the best alternative method.
分 类 号:TD861.1[矿业工程—金属矿开采]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.117.172.251