增城区派潭镇自来水厂升级改造方案的论证分析  

DEMONSTRATION AND ANALYSIS OF UPGRADING AND RECONSTRUCTION PLAN OF WATERWORKS IN PAITAN TOWN, ZENGCHENG DISTRICT

在线阅读下载全文

作  者:于方 刘小芬 赖沛华 Yu Fang;Liu Xiao-fen;Lai Pei-hua

机构地区:[1]广州增城区东进供水有限公司,广州511399

出  处:《建筑技术开发》2022年第16期84-86,共3页Building Technology Development

摘  要:随着工业和居民生活用水量的急剧增加,亟需对增城区派潭镇自来水厂进行升级改造。从原水和输水工程、土地审批及工程造价等多个方面,对派潭镇自来水厂升级改造方案进行了论证分析。分析结果表明,在原三级电站厂区新建水厂优于在原白水寨水厂北侧扩建水厂,故派潭镇自来水厂升级改造工程采用在原三级电站厂区新建水厂的方案。With the sharp increase of industrial and residential water consumption, it is urgent to upgrade the waterworks in Paitan Town, Zengcheng District. This paper demonstrates and analyzes the upgrading and reconstruction plan of Paitan town waterworks from the aspects of raw water and water delivery projects, land approval and project cost. The analysis results show that it is better to build a new waterworks in the original third-level power plant area than to expand a water purification treatment plant on the north side of the original Baishuizhai waterworks. Therefore, the upgrading and reconstruction project of the Paitan Town waterworks adopts the plan of building a new waterworks in the original third-level power station plant area..

关 键 词:派潭镇 自来水厂 升级改造 三级电站 白水寨水厂 

分 类 号:TU991.6[建筑科学—市政工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象