检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李辰舟 苏传洋 刘凯 LI Chenzhou;SU Chuanyang;LIU Kai(Changjiang Geotechnical Engineering Co.,Ltd.,Wuhan 430010,China)
出 处:《水利建设与管理》2022年第8期39-50,31,共13页Water Conservancy Construction and Management
摘 要:本文以安哥拉KK水电站为例,通过在坝址区开展工程地质测绘、物探、勘探、试验测试等综合勘察,对坝基地质条件进行复核评价,新发现主坝区顺河流右岸及河床发育的碎裂岩带,并查明碎裂岩带及带内fb1、fb2断层的产状、规模及性状;同时结合综合勘察技术成果,分析碎裂岩及片麻岩各风化带岩体性质,根据岩体性质将坝基岩体共分为六个带,对每个带(亚带)进行RMR评分,提出各带力学性质参数;根据带内岩体性状及力学性质的不同,对不同坝高对应的建基岩体进行选择,减少坝基开挖,提供安全经济的工程设计。此研究成果可供类似工程参考。Angola KK Hydropower Station is adopted as an example in the paper.The geological conditions of dam foundation is reviewed and evaluated through engineering geological mapping,geophysical prospecting,exploration,test and other comprehensive exploration in the dam site area.The calving,scale and character of cataclasite belt as well as fb1 and fb2 faults in the belt are investigated.Meanwhile,the comprehensive investigation results are combined,the rock mass properties of cataclastic and gneiss weathering zones are analyzed,and the dam foundation rock mass is divided into six zones based on rock mass properties.Each zone(sub-zone)undergoes RMR scoring.The mechanical property parameters of each zone are proposed.The foundation rock mass corresponding to different dam heights is selected to reduce the excavation of dam foundation and provide safe and economic engineering design according to the characteristics and mechanical properties of rock mass in the belt.The research results can be used as reference for similar projects.
关 键 词:高混凝土重力坝 综合勘察技术 工程地质分带 建基岩体
分 类 号:TV221.2[水利工程—水工结构工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.144.114.63