检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:杨锋 张爱民 王波 李卫强 王杰[1] 季伟利 Yang Feng;Zhang Ai-min;Wang Bo;Li Wei-qiang;Wang Jie;Ji Wei-li
出 处:《建筑技术开发》2022年第15期72-74,共3页Building Technology Development
摘 要:城市副中心C08项目总建设规模160652.39 m2,由于施工场地狭小,工期紧张、建筑物体量大,各专业交叉施工作业,质量标准要求高,因此针对不同施工阶段场区布置、大型机械设备的使用以及临水临电生活区布置提前进行了策划,有效地解决了材料堆放场地狭小的问题,并完成当年开工当年封顶的重大节点。The total construction scale of C08 project of Beijing Urban Sub Center is 160652.39 m2.Due to the narrow construction site,tight construction period,large amount of building objects,cross construction of various disciplines,and high quality standards.Therefore,our project has planned in advance for the site layout in different construction stages,the use of large machinery and equipment and the layout of water and electricity living areas,effectively solved the problem of narrow material stacking site,and completed the major nodes of capping in the year when it was started.
分 类 号:TU74[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49