检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李鹏飞 吴鹏斌 郑传海 宋伟 LI Peng-fei;WU Peng-bin;ZHENG Chuan-hai;SONG Wei(SINOPEC Guangyuan Natural Gas Purif ication Co.,Ltd.,Guangyuan 628400,China)
机构地区:[1]中石化广元天然气净化有限公司,四川广元628400
出 处:《化工管理》2022年第25期149-152,共4页Chemical Engineering Management
摘 要:脱硫单元富溶剂经贫富溶剂换热器升温后进入再生塔,富溶剂进入再生塔温度决定了溶剂再生效果及再生塔重沸器低压蒸汽用量。通过标定脱硫单元运行能耗,并与设计能耗对比分析得到结果:贫富溶剂换热器换热效果差导致再生塔低重沸器压蒸汽用量高于设计值,是脱硫单元运行能耗高于设计能耗的主要原因。并通过净化装置检修期间优化改造贫富溶剂换热器,有效降低了再生塔重沸器低压蒸汽用量,实现净化装置节能降耗。The rich solvent in desulfurization unit enters the regeneration tower after being heated by heat exchanger, and the temperature of the rich solvent entering the regeneration tower determines solvent regeneration effect and low-pressure steam consumption of the reboiler. By calibrating the operation energy consumption of desulfurization unit and comparing it with design energy consumption, the results show that the poor heat exchange effect of heat exchanger leads to the using of low-pressure steam is more than the design value, which is the main reason why the operation energy consumption is higher than the design energy consumption. By optimizing and reforming the heat exchanger during the maintenance of the purification unit, the consumption of low-pressure steam is effectively reduced, and energy saving is realized.
分 类 号:TE64[石油与天然气工程—油气加工工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222