检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:曹应华 CAO Ying-hua
机构地区:[1]安徽省皖河长江河道管理局,安徽安庆246009
出 处:《东北水利水电》2022年第9期53-55,72,共4页Water Resources & Hydropower of Northeast China
摘 要:同马大堤巨网段堤防堤基为软弱的河湖沉积层,该堤段建成后多次出现了堤顶开裂、沉陷、护坡塌陷和滑坡等险情。文中在分析该段堤防地基不均匀沉降的基础上,分别介绍了直排式真空联合堆载预压和水泥搅拌桩两种处理措施的加固机理、处理方法及优缺点。两种方案在技术上均可行,在多方面综合考虑的基础上,建议采用水泥搅拌桩处理措施。The dike base of the Juwang Section of Tongma Dyke is weak river and lake sediments. After the completion of this section, there have been many dangerous situations such as the crack of the top, subsidence, slope protection collapse and landslide.Based on the analysis of the uneven settlement of the embankment foundation in this section, the reinforcement mechanism, treatment method and advantages and disadvantages of two treatment measures, namely, the direct vacuum combined pile preloading and cement mixing pile, are introduced respectively. The two schemes are feasible in technology. On the basis of comprehensive consideration in many aspects, it is suggested to adopt cement mixing pile treatment measures.
分 类 号:TV223[水利工程—水工结构工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.188