检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:赖榕洲 吴思瑶 LAI Rongzhou;WU Siyao(Jinshan College,Fujian Agriculture and Forestry University,Fuzhou,China,350002)
出 处:《福建电脑》2022年第9期41-44,共4页Journal of Fujian Computer
基 金:福建省教育厅中青年教师教育科研项目(No.JAT191138)资助。
摘 要:为了应对建筑垃圾产量不断增长带来的一系列环境和资源问题,促进福建省建筑垃圾资源化管理,本文使用灰色模型估算2009年~2020年福建省建筑垃圾的产量。结果表明,该模型的方差比C为0.1812,最小误差概率P为1。说明模型的估算误差较小,可用于福建省建筑垃圾产量预测。In order to cope with a series of environmental and resource problems caused by the continuous growth of construction waste output and promote the resource management of construction waste in Fujian Province,this paper uses the grey model to estimate the output of construction waste in Fujian Province from 2009 to 2020.The results show that the variance ratio and the minimum error probability of the model are 0.1812 and 1,respectively.It shows that the estimation error of the model is small,and it can be used to predict the output of construction waste in Fujian Province.
分 类 号:TU5[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7