摘 要:青海察尔汗盐湖地区地基多为饱和盐渍软土,具有强腐蚀性,其地基处理是一个行业难题。某烟囱位于察尔汗盐湖,地基承载力要求较高,已有DPD强夯法能解决强腐蚀性问题,但承载力提高幅度有限。为解决其高承载力及变形控制问题,经技术经济比较,在DPD强夯法基础上,创新采用联合预应力混凝土管桩复合地基方案进行处理,将地基承载力从180kPa提高至280kPa。该工程使用多年,效果良好。The foundation of Qarhan Salt Lake in Qinghai Province is saturated soft soil with strong corrosion, and its treatment is an industry problem. A chimney is located in Qarhan Salt Lake, and the bearing capacity of foundation soil is required to be high. DPD dynamic compaction method has been used to solve the problem of strong corrosion, but the increase of bearing capacity is limited. In order to meet the requirements of high bearing capacity and deformation control, through technical and economic comparison, the composite foundation scheme of adding prestressed concrete pipe pile on the basis of DPD dynamic compaction method is proposed. The bearing capacity of the foundation is improved from 180 kPa to 280 kPa. The project has been used for many years with good results.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7