检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:解凌飞 李德 杨丽 郑慧娟 陈雷 XIE Ling-fei;LI De;YANG Li;ZHENG Hui-juan;CHEN Lei(Hubei Institute of Water Resources Survey and Design,Wuhan 430064,Hubei Province,China;Hubei Water Resources Research Institute,Wuhan 430070,Hubei Province,China;Hubei Water Resources and Hydropower Science and Technology Promotion Center,Wuhan 430070,Hubei Province,China)
机构地区:[1]湖北省水利水电规划勘测设计院,武汉430064 [2]湖北省水利水电科学研究院,武汉430070 [3]湖北省水利水电科技推广中心,武汉430070
出 处:《中国农村水利水电》2022年第9期201-208,共8页China Rural Water and Hydropower
基 金:湖北省水利重点科研项目(HBSLKY202111)。
摘 要:碾盘山水利水电枢纽工程采用BIM技术开展正向协同设计,建立了项目级BIM应用标准,探索研究各专业三维协同设计流程。在基于BIM技术的三维协同设计架构内,通过结构参数化设计、碰撞检测、仿真模拟、4D施工模拟、三维技术交底等展示了设计阶段BIM主要应用点。通过创新尝试实现了无人机正摄影像叠加BIM模型核验工程关键信息,利用Dynamo可视化编程开发了桩基自动布置和混凝土结构三维快速配筋工具,打造了WEB端BIM+GIS管理平台为设计和工程管理提供数据信息服务。实践表明,BIM技术为碾盘山水利水电枢纽工程的建设提供了全面、有效的帮助,提高了设计效率,提升了设计质量,为BIM技术在水利水电工程中的应用做了一个良好的示范。Nianpanshan water conservancy and hydropower project adopts BIM Technology to carry out forward collaborative design,establishes project level BIM application standards,and explores and studies the three-dimensional collaborative design process of various disciplines.In the three-dimensional collaborative design framework based on BIM Technology,the main application points of Bim in the design stage are displayed through structural parametric design,collision detection,equipment operation simulation,simulation calculation,4D construction simulation and three-dimensional technical disclosure.Through innovative attempts,we have realized the verification of key information of the project by superimposing BIM model with UAV forward photography,developed the automatic layout of pile foundation and three-dimensional rapid reinforcement tool of concrete structure by using dynamo visual programming,and built a web BIM + GIS management platform to provide data information services for design and Engineering Management.The practice shows that BIM Technology provides comprehensive and effective help for the construction of Nianpanshan water conservancy and hydropower project,improves the design efficiency and design quality,and makes a good demonstration for the application of BIM Technology in water conservancy and hydropower projects.
关 键 词:碾盘山 水利水电枢纽 设计与应用 BIM GIS
分 类 号:TV61[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.70