检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:关永发 周国旺 王海燕 宋思远 Guan Yongfa;Zhou Guowang;Wang Haiyan;Song Siyuan(Powerchina Huadong Engineering Corporation Limited,Hangzhou,Zhejiang 311122,China)
机构地区:[1]中国电建集团华东勘测设计研究院有限公司,浙江杭州311122
出 处:《绿色科技》2022年第16期178-182,共5页Journal of Green Science and Technology
摘 要:前置库是指在水库入口处设置规模相对较小的水库,可实现对入库水体的污染物进行削减,为水库水质提供保障。通过在长春市永春河入八一水库处建设“预处理塘+垂直潜流湿地+表流湿地”组合工艺的前置库生态净化工程,实现了对永春河水质的进一步净化。结果表明:前置库生态净化工程能够有效削减水体污染物,出水COD去除率为50.00%,年去除量为26.95 t;出水NH_(3)-N去除率为77.73%,年去除量为1.84 t;出水TP去除率为72.92%,年去除量为0.38 t。The pre-dam is a relatively small reservoir set at the inlet of the reservoir,which can reduce the pollutants in the reservoir water and guarantee the water quality of the reservoir.In order to further purify the water quality of Yongchun River,a pre-dam with the combined technology of "pretreatment pond + vertical subsurface wetland + surface wetland" was constructed at the point where Yongchun River enters Bayi Reservoir in Changchun City.The results show that the pre-dam ecological purification project can effectively reduce water pollutants;the removal rate of COD is 50.00 %;the annual removal amount is 26.95 t;the removal rate of NH_(3)-N is 77.73%,and the annual removal amount is 1.84 t;the removal rate of TP is 72.92%,and the annual removal amount is 0.38 t.
分 类 号:X321[环境科学与工程—环境工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49