大黑汀水利枢纽渠首电站机电设备改造  

Rehabilitation of Mechanical and Electrical Equipment of Hydropower Station at Canal Head of Daheiting Water Control Project

在线阅读下载全文

作  者:齐津安[1] 周涛 李秀峰 周世虎[1] 付靓 QI Jin'an;ZHOU Tao;LI Xiufeng;ZHOU Shihu;FU Liang(Luanhe River Diversion Project Administration under Haihe River Water Conservancy Commission,MWR,Qianxi 064300,China)

机构地区:[1]水利部海委引滦工程管理局,河北迁西064300

出  处:《西北水电》2022年第4期90-93,共4页Northwest Hydropower

摘  要:通过分析大黑汀水利枢纽渠首电站运行中存在的问题,提出了机组转轮渗漏油、拦污栅抓梁、机组增效扩容等改造措施,工程防洪能力、发电效率、供水效益等得到了充分的提高,取得了较好效果。By analyzing the problems existing in the operation of the hydropower station at canal head of the Daheiting Water Control Project,the rehabilitation measures such as treatment of oil leakage from the runner of the unit,restoration of grabbing beams for the trash rack,and expansion of the unit capacity are put forward.The project flood control capacity,power generation efficiency,and water supply benefits have been significantly improved,and the transformation has been successful.

关 键 词:转轮渗漏油 拦污栅抓梁 机组改造 效益分析 

分 类 号:TV734[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象