检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李惠明 赵宇 LI Huiming;ZHAO Yu(Goupitan Power Plant of Guizhou Wujiang Hydropower Development Co.,Ltd.,Yuqing 564408;Wujiangdu Power Plant of Guizhou Wujiang Hydropower Development Co.,Ltd.,Zunyi 563000)
机构地区:[1]贵州乌江水电开发有限责任公司构皮滩发电厂,贵州遵义564408 [2]贵州乌江水电开发有限责任公司乌江渡发电厂,贵州遵义563000
出 处:《电力安全技术》2022年第7期62-65,共4页Electric Safety Technology
摘 要:水电厂单相主变压器更换备用变工作具有一定的特殊性,工艺上也与新主变的安装、运行主变的检修等有所不同。通过对某水力发电厂在500 kV单相主变压器更换备用变工作中遇到的相关工艺问题进行分析,得出一些相关经验、结论,为提高电力系统中类似工作的效率、安全及质量保证水平提供借鉴。The replacement of standby transformer instead of initial single-phase main transformer for hydropower plants appears a certain particularity,and its replacement process is also different from the installation of a new main transformer and the maintenance of an operating main transformer.By analyzing the relevant process problems encountered in the replacement of a standby transformer instead of a 500 kV single-phase main transformer in a hydropower plant,some relevant experience and conclusions are obtained,which offers reference for improving the efficiency,safety and quality assurance level of similar activities in the power system.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.128.205.62