水电厂500kV单相主变更换备用变工艺要点分析  

Analysis on Technical Key Points of Replacing a Standby Transformer Instea of a 500 kV Single-phase Main Transformer in a Hydropower Plant

在线阅读下载全文

作  者:李惠明 赵宇 LI Huiming;ZHAO Yu(Goupitan Power Plant of Guizhou Wujiang Hydropower Development Co.,Ltd.,Yuqing 564408;Wujiangdu Power Plant of Guizhou Wujiang Hydropower Development Co.,Ltd.,Zunyi 563000)

机构地区:[1]贵州乌江水电开发有限责任公司构皮滩发电厂,贵州遵义564408 [2]贵州乌江水电开发有限责任公司乌江渡发电厂,贵州遵义563000

出  处:《电力安全技术》2022年第7期62-65,共4页Electric Safety Technology

摘  要:水电厂单相主变压器更换备用变工作具有一定的特殊性,工艺上也与新主变的安装、运行主变的检修等有所不同。通过对某水力发电厂在500 kV单相主变压器更换备用变工作中遇到的相关工艺问题进行分析,得出一些相关经验、结论,为提高电力系统中类似工作的效率、安全及质量保证水平提供借鉴。The replacement of standby transformer instead of initial single-phase main transformer for hydropower plants appears a certain particularity,and its replacement process is also different from the installation of a new main transformer and the maintenance of an operating main transformer.By analyzing the relevant process problems encountered in the replacement of a standby transformer instead of a 500 kV single-phase main transformer in a hydropower plant,some relevant experience and conclusions are obtained,which offers reference for improving the efficiency,safety and quality assurance level of similar activities in the power system.

关 键 词:主变压器 备用变压器 移位 电气试验 冲击试验 

分 类 号:TM407[电气工程—电器]

 