检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:郭潇艺 GUO Xiaoyi
机构地区:[1]深圳市市政设计研究院有限公司,广东深圳518029
出 处:《福建建设科技》2022年第5期107-109,127,共4页Fujian Construction Science & Technology
摘 要:为研究V墩施工和成桥下的受力,合理确定V墩结构尺寸,基于平潭竹屿湖大桥,在满足各项设计条件及技术指标下,针对几种不利工况,分别研究V墩墩高、叉角角度、墩身厚度等设计参数对结构受力的影响,最终确定了V墩结构的合适尺寸,同时也发现了V墩在施工过程不对称荷载作用下,其受力情况可能比成桥状态更为不利,应针对不同工况加强结构,本文也可为同类结构设计提供参考。To study the structural internal force of V-shaped pier during the construction and completion state, and determine the structure of V-shaped pier reasonably, the paper analyzed the influence of the pier height, the pier angle, the pier thickness, etc., on the structure of the Zhuyu Lake Bridge in Pingtan, based on several adverse conditions which meets the design conditions and the technical indicators. Finally, the suitable dimensions of V-shaped pier was determined. In addition, the internal situation during the asymmetrical loading construction of the V-shaped may be more adverse than the completion state. Thus, according to the different load condition, the structure should be strengthened. The study of this paper can also provide reference for similar structural design.
分 类 号:U443.22[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145