供水钢管非开挖穿越动车所沉降控制研究  

Study on settlement control of water supply steel pipe under railway station using trenchless technology

在线阅读下载全文

作  者:郑守铭 ZHENG Shouming

机构地区:[1]福州城建设计研究院有限公司,福建福州350001

出  处:《福建建设科技》2022年第5期113-116,共4页Fujian Construction Science & Technology

摘  要:以福建省平潭及闽江口水资源配置工程8~10#顶管区间段为例,研究顶管法穿越下伏粘土夹卵石地层的高铁动车所沉降控制方案。针对地面沉降要求严格、施工难度大等难点,对施工设计方案、复杂地层设备选型、注浆减阻等技术进行优选,地面沉降实测值得到良好控制,为今后类似工程施工提供参考。Taking 8# ~ 10# pipe jacking section of Pingtan and Min River Estuary resource allocation project in Fujian Province as an example, the settlement control of pipe jacking passing through the high-speed railway station under the clay and pebble formations are studied. In view of the difficulties such as strict requirements for land settlement and difficult construction, the construction design plan, the selection of complex formation equipment and the grouting drag reduction technology are optimized, and the measured settlement value are well controlled, providing a reference for similar engineering construction in the future.

关 键 词:钢顶管 注浆减阻技术 地面沉降控制 

分 类 号:TU991.36[建筑科学—市政工程] U238[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象