检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:江如春 沈芳芳 朱宁[1] 张歆 JIANG Ruchun;SHEN Fangfang;ZHU Ning;ZHANG Xin(Jiangdu Water Conservancy Project Management Office of Jiangsu Province,Yangzhou 225200,China;Jiangsu Water Conservancy Science and Education Center,Nanjing 210029,China)
机构地区:[1]江苏省江都水利工程管理处,江苏扬州225200 [2]江苏省水利科教中心,江苏南京210029
出 处:《江苏水利》2022年第9期69-72,共4页Jiangsu Water Resources
摘 要:高质量开展大型水泵机组安装检修是保障工程安全稳定运行的基础。水泵机组安装检修关键环节工序复杂、技术要求高,通过研究设计大型立式轴流泵机组安装检修仿真装置,模拟机组垂直同心、摆度、水平、中心等核心技术参数的调整测量,实现水泵机组物理孪生,辅助科学决策,提升水泵机组安装检修效率和质量,帮助提高水利职工技术业务水平。To carry out the installation and maintenance of large water pump units with high quality is the basis to ensure the safe and stable operation of the project. The key links in the installation and maintenance of the water pump unit have complex procedures and high technical requirements. Through research, a large-scale vertical axial-flow pump unit installation and maintenance simulation device is designed. The adjustment and measurement of the core technical parameters such as vertical concentricity, swing, horizontal and center of the simulation unit can realize the physical twin of the water pump unit, assist scientific decision-making, improve the installation and maintenance efficiency and quality of the water pump unit, and help to improve the technical and business level of water conservancy workers.
分 类 号:TV675[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117