检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘志强 陈湘生 宋朝阳[1,2] 程守业 LIU Zhi-qiang;CHEN Xiang-sheng;SONG Zhao-yang;CHENG Shou-ye(Beijing China Coal Mine Engineering Co.,Ltd.,Beijing 100013,China;National Engineering Research Center of Deep Shaft Construction,Beijing 100013,China;College of Civil and Transportation Engineering,Shenzhen University,Shenzhen 518061,China)
机构地区:[1]北京中煤矿山工程有限公司,北京100013 [2]矿山深井建设技术国家工程研究中心,北京100013 [3]深圳大学土木与交通工程学院,深圳518061
出 处:《工程科学学报》2022年第10期1733-1745,共13页Chinese Journal of Engineering
基 金:国家自然科学基金资助项目(52004125);中国工程院咨询研究资助项目(2019-XZ-16);天地科技股份有限公司创新创业资金重点资助项目(2021-2-TD-ZD006)。
摘 要:深部矿产与地热资源共采战略为实现“矿-热”经济有效开发和实现双赢提供了有效途径,深部高温地层井巷建设技术是“矿-热共采”战略安全高效实施的重要支撑和保障.分析了深部“矿-热共采”战略对井巷建设技术需求的必要性和迫切性,梳理了矿山井巷建设技术现状和存在的不足,阐述了矿山井巷智能化建设方面的研究进展与发展路径;剖析了深部高温地层井巷建设面临的难题与挑战,提出了深部高温地层井巷工程建造技术发展的三大优先发展任务:1)深部高温地层井巷建设地质保障系统;2)深部高温地层井巷建设模式与规划;3)深部高温地层井巷建设成套技术与装备.结合三大优先发展任务,凝练出8项基础理论与关键技术的发展方向:地层原位探识与透明化重构、高温地层井巷建设工艺适宜性、高温地层非爆破破岩、深井连续提升、深部不良地层改性与围岩长期稳定性控制、深井热害治理、井巷装备智能感知、井巷掘进装备智能控制.基于以上内容,初步构建了深部高温地层井巷建设基础理论与技术研究体系,以期为深部资源开采清洁化和地热清洁能源规模化发展提供参考.The joint exploitation of deep mineral and geothermal resources strategy provides an effective way to realize the economic exploitation of“resources-thermal”and achieve a win-win situation.The technology for deep high-temperature stratum shaft and roadway construction is an important support and guarantee for the safe and efficient implementation of the“ore-thermal comining”strategy.The necessity and urgency of this deep“ore-thermal co-mining”strategy to the technical requirements of shaft and roadway construction are analyzed.Combined with the analysis of the status quo of mine construction technology,it is clear that the non-blasting rock breaking technology represented by mechanical rock breaking is an important direction in the development of deep shaft and roadway construction technology at present.Mechanical rock breaking technology is a technical approach to solve the existing problems in the process of drilling and blasting excavation,such as too many underground workers,complex working procedures,serious occupational injury,and environmental pollution.In the hard rock stratum,partial section roadheader equipment has low boring efficiency,large tool consumption,and high economic cost,whereas full-section boring machines used for shaft or roadway have advantages in detection,rock breaking,slag discharge,surrounding rock supporting,and other aspects.Therefore,the development direction of intelligent shaft and roadway construction is proposed.It analyzes the difficulties and challenges faced by shaft and roadway construction in the deep high-temperature stratum,such as precise formation exploration,formation reinforcement and water plugging,high ground temperature prevention and control,high ground stress prevention and control,deep shaft lifting,and manufacturing of shaft and roadway boring machines.Three priority development tasks are proposed:1)a geological guarantee system for deep hightemperature strata shaft and roadway construction;2)a construction mode and planning of shaft and roadway in
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.216.105.175