检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:赵欣 ZHAO Xin(BCEG Civil Engineering Co.,Ltd.,100015,Beijing,China)
出 处:《建筑技术》2022年第9期1163-1165,共3页Architecture Technology
摘 要:如何在安全和经济效益下快速进行盾构机刀具检修或更换,成为制约盾构是否顺利掘进、能否提高掘进效率的关键问题。北京地铁6号线4标慈寿寺站–花园桥站盾构区间工程,通过4次小竖井结合地层加固的辅助施工方法,在不开仓的情况下,快速完成了刀盘刀具的检修更换施工作业,取得了良好的效果,值得进一步推广和借鉴。How to rapidly maintain or replace the shield machine tools in a safe&economic manner becomes a key issue to restrict the smooth tunneling and improve the tunneling efficiency.In the section Cishousi Station~Huayuanqiao Station in Bid 4#of Beijing Subway Line 6,tool maintenance and replacement are rapidly completed without opening the magazine by adopting the auxiliary construction method of 4 small shafts in combination with stratum reinforcement and favorable effects are realized.This technology is worthy of further popularization and reference.
分 类 号:TU74[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.200