检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:武博庆[1] WU Bo-qing(Retirement Office,Haihe Water Conservancy Commission of the Ministry of Water Resources,300170,Tianjin,China)
机构地区:[1]水利部海河水利委员会离退休处,天津市河东区龙潭路15号300170
出 处:《河北水利电力学院学报》2022年第3期1-6,共6页Journal of Hebei University Of Water Resources And Electric Engineering
摘 要:我国是水库大国,有水库9.8万余座,为社会创造了巨额财富,也是社会一笔巨额资产,应对水库大坝资产进行评估。但是,我国尚无水利资产专业评估方法,如采用适用于普通资产的常规方法评估水库大坝资产常使成果不能反映实际。文中基于笔者断续参加的25个水利资产评估项目工作经验积累,提出以项目功能状态法评估水库大坝资产,以探索问题解决。China is a large reservoir country,with more than 98,000 reservoirs,which has created huge wealth for the society and is also a huge social asset so that the assets of reservoir dams should be evaluated.However,there is no professional evaluation method for water conservancy assets in China.If the conventional method suitable for ordinary assets is used to evaluate the assets of reservoir dams,the results often cannot reflect the reality.Based on the accumulated work experience of 25 water conservancy asset evaluation projects participated intermittently,this paper proposes to use the project function state method to evaluate the reservoir dam assets in order to explore the problem-solving.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.188.93.255