检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:柏新宇 BAI Xinyu(Changcun Coal Mine of Lu'an Chemical Group,Changzhi046102,China)
出 处:《煤》2022年第10期8-12,共5页Coal
基 金:山西省煤基重点科技攻关项目(MJ2014-12)。
摘 要:针对厚煤层综放面停采后在工作面后方形成悬臂结构,进而传递覆岩应力,导致煤柱内超前应力影响范围广,需留设较大尺寸煤柱护巷而导致煤炭资源浪费。以常村煤矿2106工作面为背景,采用理论分析、数值模拟、现场实测相结合的方法对厚煤层综放面末切顶及合理停采位置进行研究。得出不切顶情况下煤柱留设尺寸应大于70 m,切顶后煤柱留设尺寸可优化至60 m.现场应用停采线距离准备巷道60 m,并对2106工作面对应的区域进行矿压监测,监测结果表明,切顶后巷道围岩变形量较小,在服务周期内可稳定使用,研究结果可为同类工程提供有益参考。After the stoppage of fully mechanized caving face of thick coal seam, the cantilever structure is formed behind the working face to transfer the overburden stress, which leads to a wide range of influence of advanced stress in coal pillar, and it is necessary to set large size coal pillar to protect the roadway, resulting in waste of coal resources.Taking the 2106 working face of Changcun Coal Mine as the background, the method combining theoretical analysis, numerical simulation and field measurement is used to study the final top cutting and reasonable stoping position of fully mechanized caving face of thick coal seam.It is concluded that the coal pillar retaining size should be greater than 70 m without cutting the top, and the coal pillar retaining size can be optimized to 60 m after cutting the top.The stop-mining line is 60 m away from the prepared roadway, and the corresponding area of 2106 working face is monitored by mine pressure.The monitoring results show that the roadway surrounding rock deformation is small after the roof cutting, and it can be used stably in the service cycle.The research results can provide useful reference for similar projects.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.129.253.54