施工阶段划分模式对悬浇连续梁(刚构)施工预拱度的影响分析  被引量:1

Analysis of Influence of Construction Stage Division Mode on Construction Precamber of Cantilever Casting Continuous Beam(Rigid Frame)

在线阅读下载全文

作  者:董毓 Dong Yu(Shengzhou Chengnan Construction Investment Co.,Ltd.,Zhejiang Shengzhou,312400,China)

机构地区:[1]嵊州市城南建设投资有限公司,浙江嵊州312400

出  处:《石家庄铁路职业技术学院学报》2022年第3期43-47,共5页Journal of Shijiazhuang Institute of Railway Technology

摘  要:悬臂浇筑的连续梁(刚构)桥施工中须设置施工预拱度,该预拱度的设置有多种影响因素。通过分析与实例计算结果表明,这些影响因素中容易被计算者忽视的施工阶段划分方式恰恰是对施工预拱度的设置具有决定作用的因素。Construction precamber must be set in the construction of cantilevered casting continuous beam(rigid frame)bridge,and the setting of precamber has many influence factors.The analysis and example calculation results show that among these influencing factors,the construction stage division method,which is easily overlooked by the calculator,is the decisive factor for the setting of the construction precamber.

关 键 词:悬臂施工 预拱度设置 施工阶段划分 

分 类 号:U445.466[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象