张庄铁矿高阶段二步采矿房边帮控制爆破探索  被引量:3

Exploration on Side Control Blasting of High Stage Second-step Mining Room in Zhangzhuang Iron Mine

在线阅读下载全文

作  者:王玉富 余剑 孙永茂 王南南 WANG Yufu;YU Jian;SUN Yongmao;WANG Nannan(Anhui Masteel Zhangzhuang Mining Co.,Ltd.)

机构地区:[1]安徽马钢张庄矿业有限责任公司,安徽省六安市237000

出  处:《现代矿业》2022年第9期75-77,154,共4页Modern Mining

摘  要:在阶段空场嗣后充填法二步回采时,爆破作用对充填体产生损伤,导致大量充填体垮塌,影响充填体稳定性和采场回采安全性。为了有效控制爆破作业对充填体的破坏,基于张庄铁矿工程特性,通过理论分析,得出高阶段二步采矿房护壁矿柱厚度及高阶段边帮爆破参数,经工业试验并结合采空区三维扫描对边界爆破效果进行分析。结果表明,此高阶段二步回采缓冲爆破方案取得了较好的爆破效果,对同类型矿山具有借鉴价值。In the second-step stoping of stage open stoping with subsequent filling method,the blasting damage to the filling body,resulting in a large number of filling body collapse,affecting the stability of the filling body and stope mining safety.In order to effectively control the destruction of filling body caused by blasting operation,based on the engineering characteristics of Zhangzhuang Iron Mine,through theoretical analysis,the thickness of wall protection pillar of high-stage second-step stoping room and the blasting parameters of high-stage side wall are obtained.The boundary blasting effect is analyzed through industrial tests and three-dimensional scanning of the goaf.The results show that this high-stage secondstep stoping buffer blasting scheme has formed a good blasting effect,which has reference value for the same type of mines.

关 键 词:二步回采 护壁矿柱 缓冲爆破 

分 类 号:TD853.34[矿业工程—金属矿开采] TD235[矿业工程—矿山开采]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象