检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:彭兆祥 熊贤亮 向铸 PENG Zhaoxiang;XIONG Xianliang;XIANG Zhu(Wisco Resources JinShanDian Mining Co.,Ltd.;Sinosteel Maanshan General Institute of Mining Research Co.,Ltd.)
机构地区:[1]武钢资源金山店矿业有限公司,湖北省大冶市435116 [2]中钢集团马鞍山矿山研究总院股份有限公司
出 处:《现代矿业》2022年第9期82-86,共5页Modern Mining
摘 要:以金山店铁矿为背景,对东区上、下盘采场溜井破坏现状及破坏原因进行分析研究。为减少今后溜井破坏情况,对于现已启用的溜井,在启用分层的溜井口加装格筛,并对使用完毕的井筒进行分段封闭;对于新建溜井,研究确定了溜井间距、位置、断面形状和尺寸。这些措施在金山店铁矿的实际生产中逐步应用,取得了积极的效果,对同类地下金属矿山溜井维护具有一定的参考价值。Taking Jinshandian Iron Mine as the background,this paper analyzes and studies the cur⁃rent situation and causes of the destruction of the ore chutes in the upper and lower stopes of the east area.In order to reduce the destruction of the ore chutes in the future,for the ore chute that has been put into use,the screens are installed at the ore chute that has been put into use for layering,and the used shaft is closed in sections.For the newly-built chutes,the distance,position,section shape and size of the chutes are determined.These measures have been gradually applied in the actual production of Jinshandian Iron Mine,and have achieved positive results,which has certain reference value for the maintenance of chutes in similar underground metal mines.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.145.79.94