检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张学 ZHANG Xue(Yunnan Phosphate Group Haikou Phosphorus Industry Co.,Ltd.)
机构地区:[1]云南磷化集团海口磷业有限公司,云南省昆明市650113
出 处:《现代矿业》2022年第9期95-97,118,共4页Modern Mining
摘 要:为研究尾矿库三期加坝溃坝影响范围,考虑尾矿坝坝址所处地理位置、现状坝高稳定性、下游地形、设施以及暴雨等客观条件,建立溃坝模型,借助FLUENT流体计算软件,对溃坝影响范围进行模拟。结果表明:三期加坝方案可行,溃坝发生后下泄尾砂浆体主要沿库区下游的山体和沟谷方向演进,大量尾砂将堆积在下游的沟谷内;局部采取开挖泄砂沟道,确保不对半山坡的居民房屋造成冲击。In order to study the influence range of dam-break in the third phase of the tailings dam,the dam-break model is established considering the objective conditions such as the geographical location of the tailings dam site,the stability of the current dam height,the downstream topography,facilities and rainstorm.The influence range of dam-break is simulated by FLUENT fluid calculation software.The re⁃sults show that the third-stage dam-adding scheme is feasible.After dam-break,the tail-discharge mortar body mainly evolves along the mountains and valleys in the downstream of the reservoir area,and a large number of tail sand will accumulate in the valleys in the downstream.Excavation of sand drains is adopted locally to ensure that there is no impact on residential houses on half-hill slopes.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.14.12.254