检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:蔺奕存 伍刚[1] 吴青云 谭祥帅 普建国[1] 郭云飞[1] 巩桂亮 唐爽 廖军林[1] 高景辉[1] 孟颖琪[1] LIN Yicun;WU Gang;WU Qingyun;TAN Xiangshuai;PU Jianguo;GUO Yunfei;GONG Guiliang;TANG Shuang;LIAO Junlin;GAO Jinghui;MENG Yingqi(Xi’an Thermal Power Research Institute Co.,Ltd.,Xi’an 710054,China;Dongguan Shenzhen Energy Zhangyang Power Co.,Ltd.,Dongguan 523637,China)
机构地区:[1]西安热工研究院有限公司,陕西西安710054 [2]东莞深能源樟洋电力有限公司,广东东莞523637
出 处:《热力发电》2022年第9期126-131,共6页Thermal Power Generation
基 金:中国华能集团有限公司标准项目(HNBZ22-Q023)。
摘 要:燃气-蒸汽联合循环机组(简称“联合循环机组”)在冷态启动过程中,由于汽轮机金属温度低,为了避免冲转过程中产生的热应力影响机组安全,汽轮机需要进行中速暖机,以提升汽轮机金属温度,这一过程极大地限制了机组快速响应电网调峰的能力。对此,在联合循环机组中首次应用汽轮机预暖系统,并对汽轮机预暖系统投入前、后机组的2次冷态启动过程进行对比。结果表明:预暖系统可以使汽轮机在冷态整套启动前达到温态启动要求,极大地缩短了冷态启动下机组的启动时间,提高了机组的经济性。此外,通过对机组冷态预暖过程的优化改进,有效地避免了汽源压力不足造成机组转速快速下降的现象。该经验可供相关联合循环机组参考。During the cold state start-up of gas-steam combined cycle unit,the metal temperature of steam turbine is low,in order to avoid the thermal stress generated during the rotation process affecting the unit safety,the steam turbine needs medium-speed heater to increase the metal temperature,which greatly limits the ability of the unit to quickly respond to peak regulation of the power grid.Therefore,steam turbine preheating system is applied in the gas-steam combined cycle unit for the first time,and the twice cold state start-up processes of the unit before and after the steam turbine preheating system is put into operation are compared.The results show that,the preheating system can make the steam turbine reach the warm state start-up requirements before the whole cold state start-up,which greatly shortens the start-up time of the unit under the cold state start-up and improves the economy of the unit.In addition,through optimization for cold-state preheating process of the unit,the phenomenon of rapid decline of the unit speed caused by insufficient steam source pressure is effectively avoided.This experience can be referred for the relevant combined cycle units.
关 键 词:燃气-蒸汽联合循环 汽轮机 冷态预暖 快速启动 优化启动
分 类 号:TK247[动力工程及工程热物理—动力机械及工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222