检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:成润根[1] Cheng Rungen(Hydrogeological Geophysical Prospecting and Surveying Team,CNACG,Handan,Hebei 056000)
机构地区:[1]中国煤炭地质总局水文物测队,河北邯郸056000
出 处:《中国煤炭地质》2022年第S01期144-151,共8页Coal Geology of China
摘 要:在沁水盆地东北部区域开展的地震勘探技术工作中,通过优化观测系统参数、双线接收、高叠加次数和大能量信号源等措施提高了数据采集的信噪比,制定有针对性的处理手段,提供了地震时间剖面的高精度成像,采用精细构造解释、波阻抗反演、AVO属性响应特征分析,对煤层赋存形态和厚度、断裂构造形态、煤层气富集区进行了较为精准的预测,取得了较好的地质效果,为该区的煤层气开发利用奠定了坚实的基础。In the seismic prospecting technical works carried out in northeast Qinshui Basin,through observation system parameters optimization,bifilar receiving,higher stacking folds and stronger energy signal source etc measures have promoted S/N ratio in data acquisition.Constitution of individualized processing means have offered seismic time section high precision imaging ability.Using fine structure interpretation,wave impedance inversion,AVO attribute response characteristic analysis etc have predicted coal occurrence configuration,thickness,faulted structure forms and CBM enrichment area more accurate.Thus the study has achieved better geological effects,and laid a solid foundation for CBM exploitation and utilization in the area.
关 键 词:地震勘探 观测系统 二维排列 数据处理 叠前时间偏移 构造解译 波阻抗反演 AVO属性
分 类 号:P631.5[天文地球—地质矿产勘探]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.188.39.45