检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:钟履达 吕真真 禹传家 ZHONG Lv-da;LV Zhen-zhen;YU Chuan-jia(POWERCHINA SINOHYDRO ENGINEERING BUREAU 14 CO.,LTD.,Kunming 650041,China)
机构地区:[1]中国水利水电第十四工程局有限公司,云南昆明650041
出 处:《云南水力发电》2022年第9期185-188,共4页Yunnan Water Power
摘 要:可持续发展理念下的道路规划设计需要按照施工组织设计及批准的平面布置图,认真搞好施工现场规划,做到布局合理,房屋驻地及邻路施工区域设彩钢板围挡,井然有序,尽量减少破坏植被和现状交通。施工营地周边应加强环境保护,禁止随意排放生活污水,避免因生活污水排放不当引发斜坡变形或其他地质灾害,对采石场、取土场及弃土场地等在工程完成后应及时进行复耕或恢复植被。Under the concept of sustainable development,road planning and design need to do a good job of construction site planning according to construction organization design and approved plan.It is necessary to lay out the houses reasonably and to set up colored steel sheet enclosures in the construction areas of houses and adjacent roads in an orderly manner so as to minimize the damage to vegetation and current traffic.Environmental protection should be strengthened around the construction camp.Discharge of domestic sewage at will is prohibited to avoid slope deformation or other geological disasters caused by improper discharge of domestic sewage.Quarries,soil collecting sites and waste sites shall be reworked or vegetation restored in time after completion of the project.
分 类 号:U412.1[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.117.129.247