检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:曾昭高 王开贵 孙啸 路学莹 ZENG Zhaogao;WANG Kaigui;SUN Xiao;LU Xueying(Sinohydro Bureau 7 Co.,Ltd,Chengdu,Sichuan 610213;Hohai University,Nanjing,Jiangsu 211100)
机构地区:[1]中国水利水电第七工程局有限公司,四川成都610213 [2]河海大学,江苏南京211100
出 处:《四川水力发电》2022年第4期58-63,共6页Sichuan Hydropower
摘 要:面板堆石坝边墙挤压和垫层料摊铺碾压施工存在工序、时间与空间的干扰以及碾压质量不易保障的问题。阐述了所设计研发的边墙挤压和垫层摊铺碾压同步施工机械装置,介绍了所进行的现场试验段施工,结合灌水法及超声波成像进行了碾压压实度和边墙垫层料结合效果评价,结果表明:该施工机械的运用提高了施工效率,加快了施工进度,垫层料压实度满足质量控制要求,边墙与垫层料交界处结合良好。For concrete faced rockfill dam(CFRD),the extruded curbs and the cushion layer overlap in construction process,with time-pace interference and no guarantees of the rolling quality.In this study,a new mechanized device is designed and developed for synchronous constructing both the curbs and the paving and rolling of cushion layer.The field test is carried out,and the compaction degree and the bonding effect between the curbs and cushion layer are evaluated by virtue of the water-injection and ultrasonic imaging.The results show that this new mechanized device improves construction efficiency and speeds up construction advancement.Meanwhile,the compaction degree of the cushion layer can meet the quality controlling requirements,and the interface between the curbs and cushion layer is well bonded.
关 键 词:垫层料 挤压边墙 同步施工 碾压质量 施工机械 研究
分 类 号:TV7[水利工程—水利水电工程] TV52TV537
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.148.182.104