作 者:童世成 黄以诚 吴征 邓慕瑶 TONG Shicheng;HUANG Yicheng;WU Zheng;DENG Muyao(State Grid Hubei Electric Power Co.,Ltd.,Ultra High Voltage Company,Wuhan 430050,China)
机构地区:[1]国网湖北省电力有限公司超高压公司,湖北武汉430050
出 处:《通信电源技术》2022年第11期62-64,共3页Telecom Power Technology
摘 要:随着信息技术的发展,在针对变电站进行优化的相关工作中,需要对接地网给予更多的关注。一旦接地网的工作开展中出现故障,将会对变电站的整体运行产生严重影响。基于此,对变电站电气一次主接地网的施工技术要点展开分析和探讨,并结合具体的案例分析接地网设计时需要注意的相关事项,以此更好地帮助相关人员开展工作。With the development of information technology,more attention needs to be paid to the grounding grid in the optimization of substations.Once a fault occurs in the work of the grounding grid,it will have a serious impact on the overall operation of the substation.Based on this,the main points of the construction technology of the electrical primary grounding grid of the substation are analyzed and discussed,and the relevant matters that need to be paid attention to in the design of the grounding grid are analyzed in combination with specific cases,so as to better help the relevant personnel to carry out their work.
分 类 号:TM862[电气工程—高电压与绝缘技术] TM63
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7