检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈嘉亮 Jialiang Chen(China Energy Engineering Group Guangdong Power Engineering Co.,Ltd.,Guangzhou,Guangdong,510700,China)
机构地区:[1]中国能源建设团集广东火电工程有限公司,中国广东广州510700
出 处:《工程设计与施工》2020年第9期42-44,共3页Engineering Design and Construction
摘 要:110kV变电站架空输电线路工程施工作业是当前输电线路建设不能缺少的一部分。紧线施工作业对塔杆、环境质量要求较高,如果这方面存在问题严重影响紧线施工效果。论文通过对架空输电线路工程施工要求进行分析,探讨变电站架空输电线路工程紧线施工面临的问题和解决措施。The construction of overhead transmission line project in 110kV substation is an indispensable part of current transmission line construction.Stringing construction has higher requirements on tower pole and environmental quality,if there are problems in this aspect,the construction effect will be seriously affected.Based on the analysis of the construction requirements of overhead transmission line project,this paper discusses the problems and solutions of tight line construction of overhead transmission line project in substation.
分 类 号:TM7[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229