检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张长缨 王彦华 李海滨 Changying Zhang;Yanhua Wang;Haibin Li(Anyang Iron&Steel Group Co.,Ltd.,Anyang,Henan,455004,China)
机构地区:[1]安阳钢铁有限责任公司,中国河南安阳455004
出 处:《工程设计与施工》2020年第4期47-48,共2页Engineering Design and Construction
摘 要:中国安钢焦化厂新建5套烟道气脱硫脱硝为5#-10#焦炉环保配套项目,其主要设备包括:卸料器、链斗机、空冷风机、助燃风机、高低温换热风机、增压风机等。该系统自2017年投运以来,为了更好地适应清洁生产,我们对其适应性的电气改造从未间断。论文从脱硫脱硝电气设备调试、运行角度出发,利用曾出现的故障处理,简要阐述焦炉烟道气脱硫脱硝电控系统。5 sets of flue gas desulfurization and denitrification are newly built in China Angang Coking Plant as 5#-10#coke oven environmental protection supporting projects,its main equipment includes:unloader,chain bucket machine,air cooling fan,combustion-supporting fan,high and low temperature heat exchange fan,booster fan,etc.Since the system was put into operation in 2017,in order to better adapt to cleaner production,our adaptive electrical transformation has never stopped.From the perspective of commissioning and operation of electrical equipment for desulfurization and denitrification,the paper briefly describes the electrical control system of coke oven flue gas desulfurization and denitrification by using the fault treatment that has occurred.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222