检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:汪胜义[1] Wang Shengyi(China Railway Major Bridge Reconnaissance&Design Institute Co.,Ltd.,Wuhan,Hubei 430050)
机构地区:[1]中铁大桥勘测设计院集团有限公司,湖北武汉430050
出 处:《工程技术研究》2022年第13期191-193,共3页Engineering and Technological Research
摘 要:文章以国道G104线宁德蕉城区城南福洋至飞鸾孝岐头段改扩建工程为依托,在满足现行设计规范条件下,不盲目追求“高大上”的建设标准,因地制宜,调查分析客观的建设条件和制约因素,对升级改造方案进行初步探讨,以实现提升交通功能、服务地方经济发展、方便沿线居民交通出行、省造价、易施工的改造目标。Based on the reconstruction and expansion project of the first section from Chengnan Fuyang to Feiluan Xiaoqi in Jiaocheng District, Ningde City on National Highway line G104, it does not blindly pursue high-end construction standards under the condition of meeting the current design specifications in this paper. According to local conditions,the objective construction conditions and constraints are investigated and analyzed to preliminarily discuss and study the upgrading and reconstruction plan in order to realize the reconstruction goals of improving traffic function, serving local economic development, facilitating the transportation for residents along the line, saving cost and making construction easier.
分 类 号:U418.8[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.148.241.79