作 者:周文锋 Zhou Wenfeng(The Guangdong No.3 Water Conservancy and Hydro-electric Engineering Board Co.,Ltd.,Dongguan,Guangdong 523710)
机构地区:[1]广东省水利水电第三工程局有限公司,广东东莞523710
出 处:《工程技术研究》2022年第11期209-211,共3页Engineering and Technological Research
摘 要:目前,复杂环境对引航道护坡提出了较高的要求。为了对复杂环境下引航道护坡进行有效优化,文章以白石窑枢纽船闸工程为例,分析了该工程中引航道排桩护岸结构所面临的征地难、地质条件复杂、跨汛期施工等难题,并根据工程重难点确定了下游引航道排桩护岸结构、衡重式挡墙的优化设计。通过该优化设计,有效地解决了各难题,确保了工程的顺利实施。At present, the complex environment puts forward higher requirements for the slope protection of approach channel. In order to effectively optimize the slope protection of approach channel in complex environment, this paper takes Baishiyao hub ship lock project as an example to analyze the problems faced by bank protection structure of approach channel with piles in the project, such as difficult land acquisition, complex geological conditions and crossflood season construction. According to the key and difficult points of the project, the optimization design of downstream approach channel pile bank protection structure and counterweight retaining wall is determined. Through the optimization design, the problems are effectively solved, and the smooth implementation of the project is ensured.
分 类 号:TU744[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.40