作 者:洪锋 Hong Feng(CCCC Fourth Harbor Engineering Co.,Ltd.,Fuzhou,Fujian 350005)
机构地区:[1]中交第四航务工程局有限公司,福建福州350005
出 处:《工程技术研究》2022年第15期23-25,共3页Engineering and Technological Research
摘 要:在航道整治工程中,为了尽可能节约施工成本、满足航道通行需求,必须根据项目实际需求制订专门的技术管理方案,促使项目有序开展。文章以京杭运河浙江段三级航道整治工程为研究对象,通过介绍围堰的三种形式,深入研究了航道整治工程围堰施工的具体流程及技术要点,并提出了具体的施工质量控制措施,研究成果可为类似项目提供参考。In the waterway regulation project,in order to save construction cost as much as possible and meet the traffic demand of the waterway,special technical management schemes must be formulated according to the actual needs of the project to promote its orderly development.This paper takes the third-grade waterway regulation project of Zhejiang section of Beijing-Hangzhou Canal as the research object.Through the introduction of three forms of the cofferdam,the specific construction process and technical points of the cofferdam construction technology of waterway regulation project are studied in depth,and the specific construction quality control measures are put forward.The research results can provide references for similar projects.
分 类 号:TV551.3[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15