检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:宋少平 Song Shao-ping
机构地区:[1]中国水利水电第四工程局有限公司勘测设计研究院,西宁810000
出 处:《建筑技术开发》2022年第18期30-32,共3页Building Technology Development
摘 要:为了加快工程的建设速度,保证工程在规定时间内完工,通常需要在冬季进行地基基础施工,大大增加了工程建设难度。基于此,本研究通过对冬季现浇混凝土地基基础施工特点的简单概述,进而以某工程作为研究对象,从内业与外业2个角度出发,介绍了施工活动的前期准备工作,然后以此为基础,对冬季现浇混凝土地基基础施工技术展开了分析,为进一步提升建筑工程冬期施工质量提供支持。In order to speed up the construction of the project and ensure that the project is completed within the specified time, it is usually necessary to carry out foundation construction in winter, which greatly increases the difficulty of project construction. Based on this, through a brief overview of the construction characteristics of castin-place concrete foundation in winter, this study takes a project as the research object, introduces the preliminary preparations for construction activities from the perspectives of interior and field work, and then based on this,analyzes the construction technology of cast-in-place concrete foundation in winter, so as to provide support for further improving the construction quality of construction projects in winter.
分 类 号:TU755.8[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15