国外某钢厂孤网系统有功冲击仿真分析  

Active Impact Simulation Analysis of Isolated Network System of a Foreign Steel Mill

在线阅读下载全文

作  者:顾正炜 金维武 GU Zhengwei;JING Weiwu(Wuxi Division,No.703 Research Institute of China Shipbuilding Industry Corporation,Wuxi 214151,Jiangsu,China)

机构地区:[1]中国船舶集团有限公司第七〇三研究所无锡分部,江苏无锡214151

出  处:《流体测量与控制》2022年第5期17-20,共4页Fluid Measurement & Control

摘  要:目前,发展中国家建设的综合钢厂一般采用自建燃气电站供电,装机容量不大,一般从几十兆瓦到上百兆瓦,不与地方电网相连,采用孤网运行模式。综合钢厂冲击负荷主要是炼钢和轧钢工艺段负荷,尤其是炼钢炉,单台功率可达十几兆瓦,对电力系统运行条件很严酷,主要是冲击负荷的投入和退出对孤网系统的频率影响较大。因此,在燃气电站供电设计过程中需对整个系统进行建模、仿真加载,确保孤网系统的稳定和可靠。At present,comprehensive steel plants built in developing countries generally use self-built gas-fired power plants for power supply,with small installed capacity,generally tens of megawatts to hundreds of megawatts,not connected to local power grids,and operate in isolated grid mode.The impact load of a comprehensive steel plant is mainly the load of the steelmaking and rolling process sections,especially the steelmaking furnace.The power of a single unit can reach more than ten megawatts.The operating conditions of the power system are very harsh,mainly the switching of the impact load to the isolated grid system.Therefore,it is necessary to model the entire system and simulate the loading process during the power generation design process of the gas-fired power station to ensure the stability and reliability of the isolated grid system.

关 键 词:综合钢厂 燃气电站 孤网系统 仿真计算 电力系统仿真软件 

分 类 号:TM621[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象