山西省万家寨引黄工程经济运行研究分析  被引量:2

Research on Economic Operation of Shanxi Wanjiazhai Yellow River Diversion Project

在线阅读下载全文

作  者:韩晶 HAN Jing

机构地区:[1]山西万家寨水控水资源有限公司,山西太原030012

出  处:《山西水利科技》2022年第3期62-64,68,共4页Shanxi Hydrotechnics

摘  要:由于山西省万家寨引黄工程的核心是总干、南干五座高扬程泵站,电费是供水运行最大的成本,通过对工程经济运行的研究,科学合理地使用好现有设备,利用好现有设施,尽可能降低单方水耗电量,降低输水用电电费,成为工程降本增效的重要手段。本次通过实测方法,从理论上分析经济运行的原则,结合调控手段提出适合当前实际的经济运行方式,进一步降低单方水耗电量。The core of the Shanxi Wanjiazhai Yellow River Diversion Project is five high-lift pumping stations located on the main trunk line and the south trunk line.Electricity cost is the biggest cost of water supply operation.By studying the economic operation of the project,using the existing equipment scientifically and reasonably,and reducing the power consumption per cubic meter of water and the power cost for water transmission as much as possible,it is an important means to reduce the cost and increase the efficiency of the project.The principle of economic operation is theoretically analyzed through the actual measurement method,and the economic operation mode suitable for the current situation is proposed in combination with the regulation means,so as to further reduce the power consumption per cubic meter of water.

关 键 词:泵站 电费 经济运行 单方水耗电量 研究 

分 类 号:TV675[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象