检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:钱栋栋 王礼武 韩君 李明 QIAN Dong-dong;WANG Li-wu;HAN Jun;LI Ming(CRRC Construction Engineering Co.,Ltd.,Beijing 100078,China;Jiangsu CRRC Urban Development Co.,Ltd.,Wuxi 214101,China)
机构地区:[1]中车建设工程有限公司,北京100078 [2]江苏中车城市发展有限公司,无锡214101
出 处:《价值工程》2022年第28期56-58,共3页Value Engineering
摘 要:以台州市域铁路S1线一期工程羊头山隧道超浅埋段施工为背景,山岭隧道内开挖施工使用三台阶临时仰拱的开挖方法,辅助以超前预注浆及洞内超前管棚支护等开挖施工方式,大大降低了隧道埋深超浅、围岩等级低地层破碎、地表水较丰富等问题造成的围岩失稳、坍塌冒顶等安全风险,可为同类工程施工提供借鉴。Taking the construction of the ultra-shallow buried section of the Yangtoushan Tunnel in the phase I of the S1 line of Taizhou Municipal Railway as the background,the excavation method of the three-step temporary inverted arch is used in the excavation of the mountain tunnel,assisted with excavation construction methods such as advanced pre-grouting and advanced pipe shed support in the cave,which greatly reduced the safety risks of surrounding rock instability,collapse and roofing caused by problems such as ultra-shallow tunnel burial depth,low-grade surrounding rock formation,and abundant surface water,which can provide reference for similar projects.
关 键 词:矿山法隧道 超浅埋段 临时仰拱 管棚支护 超前预注浆
分 类 号:U455.4[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.188.132.192