检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:耿肖 GENG Xiao
机构地区:[1]中铁第四勘察设计院集团有限公司
出 处:《电气化铁道》2022年第5期59-63,共5页Electric Railway
摘 要:赣深铁路引入深圳北站,需对深圳北站进行改造,该改造工程存在专业交叉多、施工难度大等难点问题。本文从接触网设计、过渡方案、施工重难点等方面进行分析,提出迂回供电、硬横梁过电缆等设计方案,总结了供电方案设计、接触网改造、供电线改造中的相关经验,可为国内其他高铁枢纽车站升级改造提供借鉴。Reconstruction of Shenzhen North Station is required since Ganzhou-Shenzhen High-speed Railway is introduced into the station.The reconstruction project has problems of cross construction among multiple specialties and has difficulties in its construction.The paper analyzes the key points and difficulties in terms of OCS design,transition schemes and construction,puts forward the design schemes for alternate power supply and passing through of cables from portal structures,summarizes experience concerning power supply scheme design,OCS reconstruction,reconstruction of power supply feeders.They are able to provide reference for upgrading and reconstruction of other stations of high-speed railways in China.
分 类 号:U227.8[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.127